SW run off via petrol interceptor
Provenance
1 result
Fields:
description
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
b8dcd114e5376f72e69a2ad18eb93e4a8b849a1eb77c9af130650fa6c5ab170c | description | All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development and they shall be fully operational before the site is brought into use. | 2025-02-25 |