Planning condition
CTMP- PRECOM
Field | Value | Fact links |
---|---|---|
Reference | U0113836 | Facts |
Prefix | planning-condition | Facts |
Name | CTMP- PRECOM | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Unique Condition | Facts |
Reason | To safeguard the living conditions of neighbouring residents and in the interests of highway safety | Facts |
Description | No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) the parking of vehicles of site operatives and visitors ii) loading and unloading of plant and materials iii) storage of plant and materials used in constructing the development iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) wheel washing facilities vi) measures to control noise and the emission of dust and dirt during construction vii) a scheme for recycling/disposing of waste resulting from demolition and construction works | Facts |
Contents
{
"reference": "U0113836",
"prefix": "planning-condition",
"name": "CTMP- PRECOM",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73001426,
"notes": "Unique Condition",
"reason": "To safeguard the living conditions of neighbouring residents and in the interests of highway safety",
"description": "No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) the parking of vehicles of site operatives and visitors ii) loading and unloading of plant and materials iii) storage of plant and materials used in constructing the development iv) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) wheel washing facilities vi) measures to control noise and the emission of dust and dirt during construction vii) a scheme for recycling/disposing of waste resulting from demolition and construction works"
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.