Planning condition
SW run off via petrol interceptor
Field | Value | Fact links |
---|---|---|
Reference | DX24A | Facts |
Prefix | planning-condition | Facts |
Name | SW run off via petrol interceptor | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Standard Condition | Facts |
Reason | To avoid pollution of the public sewer and land drainage system. | Facts |
Description | All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development and they shall be fully operational before the site is brought into use. | Facts |
Contents
{
"reference": "DX24A",
"prefix": "planning-condition",
"name": "SW run off via petrol interceptor",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000023,
"notes": "Standard Condition",
"reason": "To avoid pollution of the public sewer and land drainage system.",
"description": "All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development and they shall be fully operational before the site is brought into use."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.