  • Permeability tests to be approved

    Policy

    Before the development is commenced permeability tests (in accordance with BRE365) shall be carried out to prove that ground conditions are suitable for a soakaway type septic tank effluent disposal system. The test results shall be submitted to and approved by the Local Planning Authority prior to the commencement of the development.

    Reference
    DN14A
  • SUDS01

    Policy

    No building hereby permitted shall be occupied until the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be designed, managed and maintained in accordance with the Non-statutory technical standards and local standards

    Reference
    DS01
  • SUDS02

    Policy

    The Developer should be aware that a Sustainable Drainage System (SuDS) is the LPA's preferred option. A detailed explanation of any alternative option and reasons for rejecting a SuDS solution will be required.

    Reference
    DS02
  • SW run off via petrol interceptor

    Policy

    All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development and they shall be fully operational before the site is brought into use.

    Reference
    DX24A
  • Floor Levels

    Policy

    Floor levels within the proposed development will be set no lower than existing floor levels

    Reference
    FA01
  • Flood Proofing

    Policy

    All flood proofing resilience and resistance techniques shall be included in the extension as per the guidance issued by The Department for Communities and Local Government 'Improving the flood performance of new buildings' May 2007.

    Reference
    FA02
  • Site surfaced and sealed

    Policy

    Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.

    Reference
    HIGH1
  • Crossing over footpath/verge

    Policy

    The development hereby approved shall not be brought into use until a crossing over the footpath/verge has been constructed in accordance with a scheme previously approved in writing by the local planning authority.

    Reference
    HIGH11
  • Site surfaced and sealed

    Policy

    Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.

    Reference
    HIGH1A
  • Vehicle turning space

    Policy

    The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such.

    Reference
    HIGH2