3,279 results

  • Dev on land affected by contamination

    Policy

    No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.

    Reference
    CON1C
  • Rep unexpected cont on sensitive sites

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    CON2
  • Rep unexpected cont on sensitive sites

    Policy

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    CON2B
  • Material imported onto sensitive sites

    Policy

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    CON3
  • Material imported onto sensitive sites

    Policy

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    CON3B
  • No conds/directs Applied to Decision

    Policy

    No Conditions/Directives Have been Applied To this Decision.

    Reference
    CRET
  • Storage tanks, bunds, details needed

    Policy

    Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound shall be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound shall be at least equivalent to the capacity of the largest tank, vessel or the combined capacity of interconnected tanks or vessels plus 10%. All filling points, associated pipework, vents, gauges and sight glasses must be located within the bund or have separate secondary containment. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework shall be located above ground and protected from accidental damage. All filling points and tank/vessels overflow pipe outlets shall be detailed to discharge downwards into the bund.

    Reference
    D32F1
  • No piped discharge of surface water

    Policy

    Unless otherwise approved in writing by the Local Planning Authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.

    Reference
    D54B
  • Drainage details be agreed before start

    Policy

    The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.

    Reference
    DA01
  • Septic tank discharge via herringbone

    Policy

    The discharge from the septic tank hereby approved , whether to a drainage field/mound or wetland/reedbed shall be in accordance with Part H of the Building Regulations. Details of the drainage system shall be submitted to and approved by the Local Planning Authority and be fully operational before the development is occupied.

    Reference
    DM13A